Other facilitie and buildings of various typologies
- parking
OTHER PUBLIC EQUIPEMENTS
City : COLOMBELLES Project : Construction of a leather goods
factory and rehabilitation of an old industrial hall Client : Hermès
Sellier Architects : TRYPTIQUE Competition Cost : 17 M€ Value date:
04/2025
City : ANNECY Project : Restructuring and extension
of the Departmental Archives Client : DEPARTMENT OF HAUTE-SAVOIE - DGA
BUILDINGS AND EDUCATION - BUILDINGS DEPARTMENT Architect : Bruno GAUDIN
Competition Cost : 11 M€ Value date: 03/2024
City : CAYENNE
Project : Design, construction, development and operation-maintenance
of the judicial city of Cayenne, French Guiana (973) Client : Agence
pour l'immobilier de la Justice (APIJ) Architect: Fabienne BULLE Competition
Cost : 79,4 M€ Value date: 12/2023
City : VALENCIENNES Operation:
design, construction, operation and maintenance of a national police
station and a municipal police station in Valenciennes Client : City
of Valenciennes Architect: Fabienne BULLE Competition Cost : 35,4 M€
Value date : 05/2023 "
City : ARRAS Project : Construction of
a police station Client : GENERAL SECRETARIAT FOR THE ADMINISTRATION
OF THE MINISTRY OF THE INTERIOR NORTH Architect : Fabienne BULLE Competition
Cost : 21 M€ Value date : 03/2023
City : NOISY-LE-GRAND Project
: Reconstruction of the current fire station Client : PRÉFECTURE DE
POLICE DE PARIS Architect : Fabienne BULLE Completion 2029 Cost : 17,2
M€ Value date : 02/2022
City : EPINAY-SUR-SEINE Project : New
police station Client : PRÉFECTURE DE POLICE DE PARIS Architect : Fabienne
BULLE Competition Cost : 9 M€ Value date : 03/2021
City : AULNAY
SOUS-BOIS Project : Construction of a new building allowing the regrouping
of the police station and the Company for Intervention and Security
Client : PRÉFECTURE DE POLICE DE PARIS Architect : Fabienne BULLE Competition
Cost : 12,05 M€ Value date : 03/2021
City :CAEN Project : Construction
of an exit preparation district Client : APIJ Architect : Fabienne BULLE
Builder : CMEG Competition
City : PAU Project : Rebuilding of
the Galeries Lafayette department store Client : GRANDS MAGASINS GALERIES
LAFAYETTE - CITYNOVE Architects : BRUTHER Completion 2021 Cost : 12
M€ Value date : 11/2018
City : NANTERRE Project : Conversion
of a former postal sorting center on the site of Nanterre CLC to an
Logistics Urban Hotel Client : La Poste Immo Architects : VIB Completion
2022 Cost : 18 M€ Value date : 12/2018
City : PARIS Project :
Rehabilitation and restructuring of the îlot Perrée building for the
installation of a new Paris 10th police station Client : Préfecture
de Police de Paris Architect : Bruno GAUDIN Builder : Rabot Dutilleul
Competition Cost : 27,5 M€ Value date : 09/2018
City : PARIS
Project : Restoration of east and central parts Foundation of the “Fondation
des États-Unis” at the "Cité Internationale Universitaire" of Paris
Client : Fondation des États-Unis Architect : Atelier Circonflexe Completion
2019 Cost : 3 M€ Value date : 07/2018
City : EPERNAY Project
: Creation of a center of conservation for the regional museum of archaeology
and the champagne wine Client : City of Epernay Architect : Hugues Fontenas
Completion 2019 Cost : 1,8 M€ Value date : 11/2015
City : MALAKOFF
Project : Construction of the municipal garage and building for the
urban cleaning service Client : City of Malakoff Architect : Philippe
DUBUS Completion 2020 Cost : 10,4 M€ Value date : 06/2015
City
: SAINT DENIS Project : N. I.P.S. and police station Saint-Denis Client
: Ministry for the interior / Prefecture of Police Architect : Nickl &
Partner + Richard + Schoeller Competition Cost : 31,4 M€ Value date
: 09/2015
City : CARCASSONNE Project : DDSP of Aude Client :
Ministry for the interior Architect : Fabienne Bulle Competition Cost
: 8 M€ Value date : 10/2015
City : PARIS Project : Architectural
refitting and furniture partial of the libraries of the Paris-Sorbonne
University ZAC Paris Rive Gauche – 75013 PARIS Client : ICF Architect
: Muoto Competition Cost : 2,3 M€0 Value date : 12/2014
City
: VERSAILLES Project : Construction of the Yvelines departmental territories
headquarter - 35, Noailles street in Versailles [HQE - BBC] Client :
Yvelines departmental territories headquarter Architect : Richard +
Schoeller Competition Cost : 3,15 M€ Value date : 07/2011
City
: PARIS Project : Design-build of the Paris Criminal Investigation Department
headquarter - ZAC de Clichy Batignolles – Paris [RT 2012 - HQE - Climate
Plan of Paris] Client : Police Prefecture Architect : Fabienne Bulle
Competition Cost : 85,9 M€ Value date : 09/2012
City : FORT-DE-FRANCE
Project : Construction of the new Police Headquarters of Fort de France
[Démarche environnementale] Client : Ministry of Interior Architect
: Fabienne Bulle Competition Cost : 22 M€ Value date : 03/2012
City : FOIX Project : Construction of a new courthouses in Foix
[HQE] Client : Public agency for the Justice's real estate Architect
: K-Architectures Competition Cost : 9,4 M€ Value date : 03/2011
City : PORT-AU-PRINCE Project : Reconstruction of the French Embassy
in Haiti Client : French Ministry of Foreign and European Affairs Architect
: BP Architecture Competition Cost : 9,1 M€ Value date : 04/2011
City : MORSBACH Project : Construction ofadministrative premises
and communications centre for the Sydeme (waste sorting centre) in Morsbach
[HQE - BBC] Client : SYDEME Architect : Sébastien Duron Competition
Cost : 2,58 M€ Value date : 06/2011
City : CHEVILLY LARUE Project
: Restoration of the façades, replacement of external joinery and renovation
of the flat-roof of the command post de company of the Paris fire brigade
- 382 Stalingrad Avenue in Chevilly Larue Client : Police Prefecture
Architect : F.S. Braun Competition Cost : 3,4 M€ Value date : 01/2010
City : PARIS Project : Construction of a building for public
reception with a central control station in Cité's building in Paris
Client : Police Prefecture Architect : Fabienne Bulle Completion 2015
Cost : 4 M€ Value date : 02/2010
City : VANDOEUVRE-LES-NANCY
Project : Former farm of the Chamois : creation of a multi-purpose structure
in Vandoeuvre [HQE] Client : City of Vandoeuvre Architect : K-Architectures
Competition Cost : 2,74 M€ Value date : 03/2009
City : BLOTZHEIM
Project : Creation of a building for associations in Blotzheim Client
: City of Blotzheim Architect : K-Architectures Competition Cost : 3,26
M€ Value date : 01/2009
City : VERSAILLES Project : Construction
of a Departmental Home for Disabled Persons [HQE] Client : General council
of Yvelines Architect : Bourbouze et Graindorge Competition Cost : 5,99
M€ Value date : 07/2009
City : AJACCIO Project : Construction
of a community centre in Ajaccio (Corsica) Client : City of Ajaccio
Architect : K-Architectures Competition Cost : 3,1 M€ Value date : 10/2009
City : CHANTELOUP Project : Construction of an Emergency Centre
in Chanteloup les Vignes Client : General council of Yvelines Architect
: Stoffel & Lefebvre Competition Cost : 5,56 M€ Value date : 05/2008
City : PONTOISE Project : Creation of a Criminal Investigation
pole - Lange district in Pontoise [HQE] Client : Ministry of Defence
Architect : Auer + Weber Competition Cost : 52,72 M€ Value date : 11/2008
City : CLICHY-MONTFERMEIL Project : Design-build of the police
station of Clichy-Montfermeil [HQE] Client : Paris Police Prefecture
Architect : Fabienne Bulle Completion 2010 Cost : 11,3 M€ Value date
: 05/2008
City : FOIX Project : Relocation of the justice Court
of Foix [HQE - HPE] Client : Ministry of Justice Architect : K-Architectures
Competition Cost : 9,88 M€ Value date : 06/2008
City : MARSEILLE
Project : Regional Contemporary Arts Foundation of PACA Region [HQE]
Client : PACA Region Aréa Architect : Moatti & Rivière Competition
Cost : 9,95 M€ Value date : 11/2006
City : RIS-ORANGIS Project
: Construction of an Emergency Centre in Ris-Orangsis [HQE] Client :
PACA Region Aréa Architect : Moatti & Rivière Competition Cost :
9,95 M€ Value date : 11/2006
City : ALENCON Project : Renovation
and compliance of offices and departmental buildings for the General
council of Orne Client : General council of Orne Architect : Philippe
Challes Completion 2009 Cost : 1,01 M€ Value date : 10/2007
City : PARIS Project : Training centre and railway maintenance pole
of the RATP's technical service operations in Villette Client : RATP
(Paris public transport operator) Architect : Fantastic Completion 2010
Cost : 5,7 M€ Value date : 06/2007
City : VIMOUTIERS Project
: Improvement of premises for the Vimoutiers community action centre
Client : General council of Orne Architect : Philippe Challes Completion
2009 Cost : 0,53 M€ Value date : 02/2008
City : IVRY-SUR-SEINE
Project : Construction of an Emergency Centre in Ivry-sur-Seine Client
: Paris Police Prefecture Architect : Fabienne Bulle Competition Cost
: 8,81 M€ Value date : 03/2006
City : PARIS Project : New Operational
Centre for the Paris fire brigade - Champerret centre in Paris 75017
Client : Paris Police Prefecture Architect : Fabienne Bulle Competition
Cost : 15,61 M€ Value date : 12/2005
City : LYON Project : Construction
of a new headquarter for the Regional Council of Rhône-Alpes Client
: Regional Council of Rhône-Alpes Architect : Francis Soler Competition
Cost : 85,47 M€ Value date : 04/2005
City : DOUAI Project :
New courthouse of Douai [HQE] Client : Public agency for the Justice's
real estate Architect : Moatti & Rivière Competition Cost : 12,7
M€ Value date : 06/2006
City : VAUX-LE-PENIL Project : SDIS
77 (fire brigade) [HQE] Client : SDIS 77 (fire brigade) Architect :
Philippe Challes Competition Cost : 2 M€ Value date : 05/2005
City : LAVAUR Project : Site of Lavaur - Juvenile detention centres
E.P.M. 1 Client : Public agency for the Justice's real estate Architect
: Adrien Fainsilber Completion 2007 Cost : 12 M€ Value date : 05/2005
City : PORCHEVILLE Project : Site of Porcheville - Juvenile
detention centres E.P.M. 3 Client : Public agency for the Justice's
real estate Architect : Adrien Fainsilber Completion 2007 Cost : 12
M€ Value date : 05/2005
City : MARSEILLE Project : Site of Marseille
- Juvenile detention centres E.P.M. 4 Client : Public agency for the
Justice's real estate Architect : Adrien Fainsilber Completion 2007
Cost : 12 M€ Value date : 05/2005
City : ORVAULT Project : Site
of Orvault - Juvenile detention centres E.P.M. 2 Client : Public agency
for the Justice's real estate Architect : Adrien Fainsilber Completion
2007 Cost : 12 M€ Value date : 05/2005
City : LE HAVRE Project
: Construction of the Police Headquarters and annexes to the courthouses
in Le Havre [HQE] Client : Ministry of Interior and Ministry of Justice
Architect : Fabienne Bulle Completion 2010 Cost : 35 M€ Value date :
08/2007
City : GRIMAUD Project : Construction of a Police Station
in Grimaud Client : City of Grimaud Architect : Michel Bourcy Completion
2004 Cost : 2,67 M€ Value date : 07/2003
City : AUBERVILLIERS
Project : Renovation of the Emergency Centre for the Paris fire brigade
in Aubervilliers Client : Paris Police Prefecture Architect : BP Architecture
Completion 2010 Cost : 1,84 M€ Value date : 09/2006
City : LES
ABYMES Project : Construction of a staff building and an Emergency Centre
in Les Abymes Client : SDIS-SEMAG Architect : Fabienne Bulle / Hirth
Competition Cost : 6,27 M€ Value date : 06/2003
City : BRUXELLES
Project : Construction of a new Headquarter for the North Atlantic Treaty
Organization (NATO) in Bruxelles Client : NATO Architect : Claude Vasconi
Competition Cost : 30,32 M€ Value date : 01/2002
City : LOUVIERS
Project : Construction of a new Safety & Fire centre in Louviers
Client : City of Louviers Architect : KOZ Competition Cost : 2,8 M€
Value date : 04/2002
City : CLICHY-SOUS-BOIS Project : Restoration
of the façades and the basements floors for the Clichy-sous-Bois Fire
Hall Client : Paris Police Prefecture Architect : JC Lointier Competition
Cost : 2,37 M€ Value date : 06/2002
City : PARIS Project : Renovation
of the 8th district central police station - 1, Eisenhower avenue in
Paris 75008 Client : Paris Police Prefecture Architect : JC Lointier
Competition Cost : 1,98 M€ Value date : 06/2001
City : FONTENAY-LE-FLEURY
Project : Relocation of the Saint-Cyr-l'Ecole Police station in Fontenay-Le-Fleury
Client : Ministry of Interior Architect : Serge Goldstein & Lipa
Goldstein Competition Cost : 2,34 M€ Value date : 01/2001
City
: YAOUNDÉ Project : French Embassy Economic Development Department in
Yaoundé Client : French Ministry for the Economy, Finance and Industry
Architect : BP Architecture Completion 2002 Cost : 0,58 M€ Value date
: 05/2000
City : CHARTRES Project : Construction of the new
administrative headquarter for the Eure-et-Loir Chamber of Commerce
and Industry Client : Chamber of Commerce and Industry of Eure-et-Loir
Architect : Mas & Roux Completion 2004 Cost : 4,95 M€ Value date
: 05/2002
City : MARSEILLE Project : Development of the Marseille
City Hall site Client : City of Marseille Architect : Dominique Perrault
Competition Cost : 13,16 M€ Value date : 01/1999
City : BAIE-MAHAULT
Project : Construction of Jarry Customs Investigation Service in Guadeloupe
Client : French Ministry for the Economy, Finance and Industry Architect
: Dominique & Giovanni Lelli Competition Cost : 1,7 M€ Value date
: 10/1999
City : BONNIERES Project : Construction of an Emergency
Centre in Bonnières Client : City of Bonnières Architect : JC Lointier
Competition Cost : 1,67 M€ Value date : 08/1999
City : GRENOBLE
Project : Courthouse of Grenoble Client : Ministry of Justice Architect
: Claude Vasconi - André Izoard Completion 2002 Cost : 2,18 M€ Value
date : 07/1998
City : LUXEMBOURG Project : Extension of the
court of Justice of the European Communities in Luxembourg Client :
Luxembourg administration for Public Buildings Court of Justice in Luxembourg
Architect : Dominique Perrault - Paczowski et Fritsch Completion 2008
Cost : 350 M€ Value date : 02/2002
OTHERS
City :
BOURGES Project : Restructuring of the CAP NORD shopping mall in Bourges
Client : EPARECA Architect : Linéaire A Competition Cost : 2,5 M€ Value
date : 09/2014
City : DAMMARIE LES LYS Project : Extension of
administrative premises for the Community of the Conurbation of Melun
Val de Seine Client : Community of the Conurbation of Melun Val de Seine
Architect : Muoto Competition Cost : 4,83 M€ Value date : 04/2013
City : PARIS Project : Tafanel Site development (warehouses),
Aubervilliers street in Paris 75018 [RT 2012] Client : TAFANEL Architect
: Chartier & Dalix Completion 2018 Cost : 12,6 M€ Value date : 06/2012
City : PIERREFITE-SUR-SEINE Project : Construction of the new
French National Archives centre, Emile Zola street in Pierrefite-sur-Seine
Client : French Department of the Culture and Communication Architect
: Massimiliano & Doriana Fuksas Completion 2012 Cost : 117 M€ Value
date : 11/2012
City : TREMBLAY-EN-FRANCE Project : Paris Asia
Trading Center in Tremblay en France Client : Saint-Germain Group Architect
: B+C Competition Cost : 36,77 M€ Value date : 02/2012
City
: VALENCE D'AGEN Project : Rehabilitation and extension of communal
premises in Valence d’Agen Client : Community of the Conurbation of
les deux rives Architect : Triptyque Competition Cost : 4 M€ Value date
: 09/2012
City : PRESLES EN BRIE Project : reconstruction of
the Villepatour IEM (Institute for motor skills development) day school
building in Presles-en-Brie Client : French Red Cross Architect : Atelier
Circonflèxe Completion 2015 Cost : 0,9 M€ Value date : 09/2012
City : CAUDEBEC-LES-ELBEUF Project : Landscaping of the Suchetet
public area in Caudebec-lès-Elbeuf Client : City of Caudebec-lès-Elbeuf
Architect : D-Paysage - B+C Competition Cost : 2,75 M€ Value date :
11/2012
City : PARIS Project : Interior design of a Freycinet-sized
barge ERP (public-access building) in Paris 75007 Client : City of Paris
Architect : Julien Abinal & Edouard Ropars Competition Cost : 0,45
M€ Value date : 10/2011
City : COURBEVOIE Project : Premisses
for the gardeners of Courbevoie[RT 2012] Client : City of Courbevoie
Architect : Fabienne Bulle Completion 2004 Cost : 0,46 M€ Value date
: 10/2011
City : SAINT-DENIS Project : Leroy Merlin Arrangement
of the Saint-Denis canal's bank Creation of an outside storage space
in front of the existing store Client : Leroy Merlin Architect : B+B
Competition Cost : 2,4 M€ Value date : 12/2010
City : COURBEVOIE
Project : Landscaping of Château du Loir Avenue and a square in Courbevoie
Client : City of Courbevoie Architect : Fabienne Bulle Competition Cost
: 2,5 M€ Value date : 10/2009
City : GONESSE Project : Constructionof
a shopping mall - ZAC du Parc des Tulipes Nord in Gonesse Client : EPA
plaine de France Architect : Antonio Virga Architecte Competition Cost
: 68,04 M€ Value date : 03/2008
City : PARIS Project : Enhancement
of the Duquesne Hall Client : - Architect : Maryline Gillois Cost :
Fini Cost : 0,37 M€ Value date : 07/2008
City : PARIS Project
: Lafarge - Mirabeau and Incarville Sites Client : Lafarge Architect
: Moatti & Rivière Competition Cost : 2,95 M€ Value date : 03/2008
City : PARIS Project : Carreau des Halles of Paris [HQE] Client
: City of Paris Architect : Fantastic - ARM - K-Architectures Competition
Cost : 125,31 M€ Value date : 04/2007
City : PARIS Project :
Interior design of an Yves Saint Laurent Shop 2 Client : Yves Saint
Laurent Architect : Moatti & Rivière Competition Cost : 1,13 M€
Value date : 03/2007
City : BETHUNE Project : Great Market Hall
square of Béthune Client : City of Béthune Architect : Francis Soler
Cost : Aborted project Cost : 2,5 M€ Value date : 02/2007
City
: PARIS Project : Gambetta Industrial Training Centre (CFI) in Paris
[Environnemental management] Client : Chamber of Commerce and Industry
of Paris Architect : GPAA Competition Cost : 18,45 M€ Value date : 07/2007
City : PARIS Project : Interior design of an Yves Saint Laurent
Shop Client : Yves Saint Laurent Architect : Moatti & Rivière Completion
2007 Cost : 2,33 M€ Value date : 10/2006
City : CANNES Project
: Shop Les Jardins du Miramar in Cannes Client : Private client Architect
: Moatti & Rivière Completion 2008 Cost : 4,3 M€ Value date : 07/2006
City : BOULOGNE Project : Retail space in Boulogne Client :
Nexity Foncière Colysée Icade Capri Vinci Immobilier Architect : Philippe
Dubus Completion 2006 Cost : 0,83 M€ Value date : 12/2005
City
: PARIS Project : Luna Rossa Client : Luna Rossa Architect : Vialet
architecture Competition Cost : 1,9 M€ Value date : 03/2006
City : VIMOUTIERS Project : SAST (service of social and territorial
action) of Vimoutiers Client : General council of Orne Architect : Philippe
Challes Competition Cost : 0,96 M€ Value date : 11/2006
City
: PARIS Project : Refurbishment of the Saint Jean room at the Paris
town hall Client : City of Paris Architect : Antoine Regnault Completion
2005 Cost : 0,87 M€ Value date : 03/2004
City : ARGENTAN Project
: A88 Motorway – Falaise section Architecture competition for the new
maintenance and intervention centre in Argentan Client : DDE (departmental
infrastructure authority) Architect : Vialet architecture Competition
Cost : 1,64 M€ Value date : 12/2003
City : AVON Project : Youth
centre of Avon Client : City of Avon Architect : KOZ Completion 2004
Cost : 0,56 M€ Value date : 09/2002
City : LIMOGES Project :
Expansion of the Raynaud Porcelain factory in à Limoges Client : Private
client Architect : Jean-Alexis Charles Cost : Cost analysis - Feasability
study Cost : 3,74 M€ Value date : 04/2002
City : PARIS Project
: Interior design and restoration of the façades of a Guy Laroche shop,
Saint-Honoré street in Paris Client : Guy Laroche Architect : Robert &
Saint Léger Completion 2001 Cost : 1,97 M€ Value date : 01/2001
City : PARIS Project : Interior design of the Shiseïdo shop,Boulevard
Malesherbes in Paris Client : Shiseïdo Europe Architect : A+A Cooren
Completion 2003 Cost : 0,38 M€ Value date : 10/2001
City : PARIS
Project : Rehabilitation of the Rocroy Saint-Léon chapel in Paris 75010
Client : Private middle and high school Rocroy Saint-Léon Architect
: Robert & Saint Léger Completion 2002 Cost : 0,08 M€ Value date
: 05/2001
City : LE GRAND QUEVILLY Project : Waste Treatment
and Disposal Centre - Vesta site Client : SMEDAR Architect : Claude
Vasconi Completion 2008 Cost : 5,31 M€ Value date : 09/2004
City : BLOIS Project : Interior design of the building travellers and
the restaurant of the Blois train station Client : Blois train station
Architect : Dominique Perrault Competition Cost : 1,07 M€ Value date
: 05/1999
City : AMIENS Project : Ambonne treatment plant in
Amiens Client : Amiens Métropole Architect : OAL - Edouard François
Competition Cost : 41 M€ Value date : 02/1999
City : BEAUVAIS
Project : Construction of the health and social interventions services
for the district of Beauvais Client : Department of Oise Architect :
BJAA Completion 2002 Cost : 1,37 M€ Value date : 06/1999
City
: NANCY Project : Renovation and restructuring of the central market
of Nancy Client : City of Nancy Architect : Dominique Perrault Competition
Cost : 1,69 M€ Value date : 09/1998
City : LE GRAND QUEVILLY
Project : Waste-to-energy power plant for the Conurbation of Rouen Client
: SMEDAR Architect : Claude Vasconi Completion 2000 Cost : 32 M€ Value
date : 05/1994
HOTELS – RESTAURANTS
City : BAGNOLET
Project : Construction of a studio – entertainment hall for the Pietragalla
company, and a hostel- residence in Bagnolet Client : Philia Promotion
Immobilière Architect : Moatti & Rivière Competition Cost : 12,9
M€ Value date : 11/2009
City : PARIS Project : Renovation of
the Pullman Eiffel Tower of Paris hotel Client : Accorhotels group Architect
: Moatti & Rivière Competition Cost : 0,5 M€ Value date : 01/2009
City : QUIBERON Project : Configuration and interior design
for the renovation of the Sofitel hostel and Thalassa of Quiberon Client
: Accor Hospitality Architect : Moatti & Rivière Competition Cost
: 3,78 M€ Value date : 11/2009
City : FONTENAY-AUX-ROSES SAINT-CLOUD
Project : restructuring of 3 restaurants CRE-RATP (Corporate Governance
Committee) Client : SEDP Architect : Bourbouze et Graindorge Competition
Cost : 3,98 M€ Value date : 01/2008
City : TREMBLAY-EN-FRANCE
Project : Construction of a tourist residence at the Vieux Pays in Tremblay-en-France
Client : Private client Architect : B+C Cost : Aborted project Cost
: 4,95 M€ Value date : 10/2006
City : PARIS Project : Construction
of an hotel-residence for the SNCF staff, located in Paris 75013 [H&E]
Client : SNEF - Semapa Architect : Philippe Dubus Competition Cost :
5,33 M€ Value date : 05/2006
City : PARIS Project : Creation
of a accommodation centre, a social residence and a Public servants
residence - 71, Pereire boulevard in Paris 75017 Client : Emmaus Architect
: Hubert et Roy Competition Cost : 11,24 M€ Value date : 12/2001
City : GOURNAY-EN-BRAY Project : Saint-Aubin hotel in Gournay-en-Bray
Client : Private client Architect : Robinson & Robinson Completion
2001 Cost : 1,83 M€ Value date : 10/1999
PARKINGS
City :
PARIS Project : Zac Clichy – Batignolles Housing - Commercial establishments
- Educationnal - Public silos car park Client : RIVP Architect : - Cost
: Cost analysis - Feasibility study Cost : 31,24 M€ Value date : 03/2010
City : MONTIGNY-LES-CORMEILLES Project : Public silos car park
in Montigny-Lès-Cormeilles Client : City of Montigny lès Cormeilles
Architect : B+C Cost : Cost analysis - Feasibility study Cost : 0,41
M€ Value date : 06/2005
City : VALENCIENNE Project : Public
silos car park Client : Valencienne hospital complex Architect : Cuno
Brullmann & Jean-Luc Crochon Competition Cost : 3,95 M€ Value date
: 09/2003
City : PARIS Project : Public underground car park
Ternes Client : Omniparc Architect : OAL - Edouard François Completion
2006 Cost : 12 M€ Value date : 02/2002
City : PARIS Project
: Public car park Catalogne for the extension of the pasteur park Client
: SCETA Parc Architect : Mas & Roux Completion 2003 Cost : 2,08
M€ Value date : 11/2002
City : VILLEFRANCHE-SUR-SAÔNE Project
: City of Villefranche-Sur-Saône - Public underground car park Boiron
Client : City of Villefranche-sur-Saône Architect : Philippe Challes
Completion 2006 Cost : 2,5 M€ Value date : 06/2002
City : PARIS
Project : ZAC Paris Rive Gauche – City of Paris – Parking Rue E. Durkheim
Client : Semapa Architect : Dominique Perrault Completion 2001 Cost
: 14 M€ Value date : 03/2000