Our DNA
Our website
aims to share and explain the dynamics of our agency's development,
like our internal values, and our vision of our business process.
fabrice bougon - Cost estimating and budget control’s DNA came about
thanks to a shared taste for challenges and the spirit of innovation
of our workforce.
By mobilising all our energies and resources,
we turn our vision into reality.
Our agency knows how to react
to the demands of new markets and economic models. The engineering
of the future will make a full contribution to this.
News

Restructuring of the Caychac school complex and construction of a multi-purpose hall
Our team made up of :
• Architects : HESSAMFAR & VERONS
• Economist
: Fabrice BOUGON
• Structures engineering : TERRELL
• Fluids engineering : CHOULET
• Kitchen equipment
specialist : CUISINORME
• Acoustic engineering : IDB
• Outdoor facilities engineering : CUBE2
has
been selected to the competition for the construction of
two buildings integrating reception areas, a weight room
and offices.
Client : City of Blanquefort

Construction of a leather goods factory and rehabilitation of an old industrial hall
Our team made up of :
• Architects : TRYPTIQUE
• Economist : Fabrice BOUGON
• Structures engineering : EOC
• Fluids engineering
: Espace Temps
• Environmental engineering : ZEFCO
• Lanscape : Wald
• Reuse : MOBIUS
• Fire security
: CSD & ASSOCIES
• Acoustic engineering : LAMOUREUX
Acoustics
• Outdoor facilities engineering : Strate
has been selected to the competition for the construction
of a leather goods factory and rehabilitation of an old
industrial hall on a land area of approximately 30 000 m².
Client : Hermès Sellier

Construction of a school group
Our team made up of :
• Architects : Brenac & Gonzalez & Associés
• Builder and common legal representative : DONATO CONSTRUCTION
• Others builders : RUBNER CONSTRUCTION BOIS and ELECTROFLUID
• Economist : Fabrice BOUGON
• Structures engineering
: SYLVA CONSEIL
• Wood structures engineering : EQUILIBRIUM
• Fluids engineering : SOLAB
• Lanscape : Jean-Michel
RAMEAU
has been selected to the competition for
the construction of a school group.
Client : City
of Carrières-sous-Poissy

Housing
Our team made up of :
•
Architects : Puech & Savoy
• Economist : Fabrice BOUGON
• Structures engineering : EVP
• Fluids engineering
: CHOULET
• Lanscape : Atelier Jean Chevalier
has
been selected to the competition for the construction of two
buildings allowing the realization of about 20 housing units
in Aubervilliers as part of the Marcreux development operation,
on the so-called Port Fabien block, located at the corner of
Rue du Port and Rue du Colonel Fabien. The expected floor area
is approximately 1 325 m².
Client : City of Carrières-sous-Poissy

Housing
Our team made up of :
•
Architect : Antoine REGNAULT
• Economist : Fabrice BOUGON
• Structures engineering : EVP
• Fluids engineering
: B52
• Reuse : Pimp Your Waste
has been selected
to the competition for the restructuring and raising of a real
estate complex with a view to creating a student residence of
31 studios at 19 rue de Prague in Paris 12th.
Client
: RIVP

17 housing units and 150 m² of business space on the Victor Hugo block
Our team made up of :
•
Architects : AVENIER - CORNEJO
• Economist : Fabrice BOUGON
• Structures engineering : EVP Ingénierie
• Fluids engineering
: B52
is named winner of the architectural competition
for the construction of 17 housing units and a surface area
of 150 m².
Client : RIVP

Inauguration of the NUMIXS station
Inauguration on 29 April 2025 of
the NUMIXS station designed with Francis SOLER architect, a
flagship project of the agglomeration community Roissy Pays
de France to put digital technology at the service of project
leaders, startups, students and residents.
Its objectives:
• To support and welcome the porters of projects, whatever
their field
• Fight against digital divide by providing equipment,
tools and resources to the inhabitants of the Agglomeration,
but also more largely from the Val d'Oise.
Its assets:
• An incubator to launch the startups of tomorrow
• A FacLab
to prototype in 3D
• Coworking, training and reality virtuelle
spaces.

Media library construction
Our team made up of :
•
Architects : STUDIO 1984
• Economist : Fabrice BOUGON
• Structures engineering : EVP Ingénierie
• Fluids engineering
: CHOULET
• Landscape : FAAR
• Acoustic engineering
: GAMBA
has been selected to the architectural competition
for the construction of the media library of PLAISIR.
Client : Saint-Quentin-en-Yvelines

Creation of an opera house
Team :
• Architects : La
Soda
• Economist : Fabrice BOUGON
• Structures engineering
: EVP
• Fluids engineering : Espace Temps
• Acoustic
engineering : ALTIA
• Scenography : Michel COVA
• Fire
security : INGEPREV
Construction of an opera house
Client : Les Arts florissants
Construction of
an opera house comprising :
- Public reception - Foyer
- Changing rooms - Sanitary facilities
- Stage/hall
ensemble
- Hall, orchestra pit, stage
- Reception of
artists and technicians with an annex room to the dimensions
of the stage
- Dressing rooms
- Offices
- Control
room and technical storage
- Instrument storage
Exteriors
:
- Unloading dock
- Parking with 150 to 200 spaces.

Opening of Les Fabriques school group
Les Fabriques school group was delivered and opened.

51 housing units and equipment for music
Visit by the Pavillon de l'Arsenal
of our mixed housing and equipment operation for the association
La Sirène.
Le Pavillon de l'Arsenal

Inauguration of the Simone de Beauvoir School Group
Marker of the recomposition and
renewal of the 3rd arrondissement, this establishment, initially
called Marceau, replaces a temporary prefabricated school opened
more than 10 years ago. It was inaugurated on Saturday 28 September
2024.
In total the Simone de Beauvoir School Group school
group welcomes:
- 20 classes including 8 nursery classes
and 12 elementary classrooms, equipped with an interactive digital
screen. Among these classes, two are ULIS (Localized Unit classes
for Inclusive Education),
- a 400m² accessible toy library
to all the inhabitants of the district,
- a media library,
- Rooms for visual arts and musical awakening,
- a room
multipurpose room,
- premises adapted for the reception
of leisure activities for children from 3 to 12 years old.
website of the city
made in marseille
In pictures

The construction of the digital house (NUMIXS Station) is being completed, with the completion of the facades made of basalt elements

Construction of a new school complex – Sector N7
Our team made up of :
•
Architects : Brenac & Gonzalez & Associés
• Economist
: Fabrice BOUGON
• Structures engineering : I GREEN
• Fluids engineering : SOLAB
• Lanscape : Jean-Michel RAMEAU
• Acoustic engineering : ACV
is named winner of
the architectural competition for the construction of a new
school complex – Sector N7.
Client : City of Athis-Mons
The project guidelines are :
Common rooms (about
400 students) :
- Entrance + Reception hall + Caretaker
area
- Classes (2 rooms)
- Administrative department
(teachers room, executive offices)
- Nursery (table service)
+ elementary (self-catering) catering area _ 2 services
- Medical-school premises (infirmary/psychologist/medical office)
Logistics premises :
- Preparation Office
- Maintenance
and upkeep (Laundry, linen room, garbage room)
- Technical
rooms
Kindergarten :
- 4 classrooms
- Dormitory
(26 to 52 children)
- Library/video projection room
- Motor skills room (1 to 2 classes)
- Extracurricular
- Logistics premises
- Administrative and staff rooms
- Outdoor spaces (courtyard, playground, storage, educational
garden, etc.)
Elementary :
- 8 classrooms
- Library/video
projection room
- Multipurpose room (2 classrooms)
-
Extracurricular
- Logistics premises
- Administrative
and staff rooms
- Outdoor spaces (courtyard, playground,
storage, educational garden, etc.).

Rehabilitation and conversion of Hall 3 of the Ramier Isle
Our team made up of :
•
Architects : JAKOB MACFARLANE
• Associate Architect : MR3A
• Economist : Fabrice BOUGON
• Structures engineering
: BATISERF
• Fluids engineering : INEX
• Fire security
: CSD
• Acoustic engineering : Jean-Paul Lamoureux
is named winner of the architectural competition for the
rehabilitation and conversion of Hall 3 of the Ramier Isle.
Client : Toulouse Métropole

Logistics and Technical Center
Our team made up of :
•
Architect : SCAPE
• Economist : Fabrice BOUGON
• Structures
engineering : C&E Ingénierie
• Fluids engineering :
RCA
• Sustainable development engineering : ALTOSTEP
• Outdoor facilities engineering : GINGER
• Acoustic engineering
:GAMBA
• Landscape : Atelier Tissot
has been selected
to the competition for the creation of a Logistics and Technical
Centre intended for grouping services, with the objective of
:
• Rehabilitate the existing logistics building and
develop its surroundings for the creation of the Logistics Centre.
The project will take into account the operation of the site
during the road repairs.
• Construct a building and its
annexes for the future Technical Collection Centre
• Creating
a functional link between the three real estate complexes on
the site at the end of the project .
Client : Métropole
Rouen Normandie

Shared museum reserves
Our team made up of :
•
Architect : Hugues FONTENAS
• Economist : Fabrice BOUGON
• Structures engineering : C&E Ingénierie
• Fluids
engineering : Espace Temps
• Lanscape : Frédéric Vincent
• Outdoor facilities engineering : INFRA SERVICES
has been selected to the competition for the construction
of a new facility housing the museum reserves for the Dunkerque
Museum of Fine Arts, the LAAC place of art and contemporary
action and the museum of drawing and original prints in Gravelines.
Client : Dunkerque Urban Community

Progress on the construction of the New Artois Metropolitan Hospital
After the construction of the 1
380 foundation piles, the 7 cranes are now present on the site
to allow the pouring of approximately 60 000 m³ of concrete.
More than 12 000 m³ have already been poured. About
200 workers are currently mobilized on the site and will gradually
increase to 650-700 within a year and a half.
The project
is entering its 14th month of completion over a total period
of 45.5 months.

Construction of school complex
Our team made up of :
•
Architects : NZI
• Builder and common legal representative
: AMT
• Economist : Fabrice BOUGON
• Structures engineering
: EVP
• Fluids engineering : B52
• Environmental engineering
: Zefco
• Lanscape : Pollen
• Outdoor facilities engineering
: 2IDF
• Depolution and demolition engineering : STM Environnement
• Acoustic engineering : Agiracoustique
• Kitchen equipment
specialist : Créacept
has been selected to the competition
for the construction of a school complex in LA VERRIERE to replace
the 2 schools burned down following the riots of June 2023 (Bois
de l'Étang elementary school and étang des Noës kindergarten.
Client : Yvelines Departmental Council

Rehabilitation of an empty building, to create a residence for students/researchers located at 37/41 rue Jacob in Paris 6th
Our team made up of :
•
Architects : Atelier TEQUI
• Associate Architect of Historic
Buildings : 2BDM
• Economist : Fabrice BOUGON
• Structures
engineering : Bureau Michel BANCON
• Fluids engineering
: SOLAB
• Lanscape : PRAXYS
• BIM : STUDIO BILLY
is named winner of the architectural competition for the
rehabilitation of an empty building, to create a residence for
students/researchers located at 37/41 rue Jacob in Paris 6th.
Client : RIVP
This new real estate complex will
include 63 housing units (T1, T1 bis and 1 T2), collective spaces
necessary for the proper functioning of the residence as well
as a shop on the ground floor. The surfaces will be approximately
1600m².

Rehabilitation project of the Paris hotel school building
Our team made up of :
•
Architects : TRYPTIQUE
• Economist : Fabrice BOUGON
• Structures engineering : EDEIS
• Fluids engineering :
EDEIS
• Lanscape : Espace libre
• Kitchen equipment
specialist : Conception cuisine
• Acoustic engineering :
ABC-Decibel
has been selected to the competition for
the rehabilitation and renovation of a 10 000 m² building in
an "Art Deco" spirit, owned by APHRL, which hosts the premises
of the CFA Médéric, an association under the law of 1901, an
apprentice training centre (in work-study program) which provides
training within the framework of work-study programs in the
hotel industry and restaurant services.
Client : President
of the APHRL (Professional Association of Hoteliers, Restaurateurs
and Lemonade Makers)

Sablons educational centre
Project in study.
Team :
• Architects : Brenac & Gonzalez & Associés
• Economist : Fabrice BOUGON
• Structures engineering
: EDEIS
• Fluids engineering : EDEIS
• Lanscape : 22°
• Environmental engineering : OASIIS
• Acoustic engineering
: ACV
Client : City of Grigny

Clos Mortier school complex
Our team made up of :
•
Architects : STUDIO 1984
• Associate Architect : Benoit
ZEIMEITT
• Economist : Fabrice BOUGON
• Structures engineering
: ETUDES BOIS DU BARROIS
• Fluids engineering : PHOSPHORIS
• Lanscape : AD-P
• Kitchen equipment specialist : PK
INGENIERIE RESTAURATION
• Acoustic engineering : LESLIE
ACOUSTIQUE
is named winner of the architectural competition
"for the construction of a school complex on the site of a former
college located in the Chemin du Clos Mortier.
Client
: City of Saint-Dizier

Rehabilitation and transformation of a real estate complex of offices and research laboratories, into a residence for students/researchers
Our team made up of :
•
Architects : Tom Darmon Architecture
• Associate Architect
of Historic Buildings : Pierre-Antoine Gatier, A.C.M.H
•
Economist : Fabrice BOUGON
• Structures engineering : EVP
INGENIERIE
• Fluids engineering : INEX
• Acoustic engineering
: ALHYANGE
• Lanscape : LE MA PAYSAGE
• BIM : MBA CITY
• Asbestos specialist : ALLIANCE AMIANTE
is named
winner of the architectural competition for the transformation
of an empty building at 96 boulevard Raspail in Paris 6th.
Client : RIVP
This new real estate complex will
include at least 41 T1 student housing units and 14 research
housing units from T1 to T3 as well as collective spaces necessary
for the proper functioning of the residence. The SDP will be
about 1700m².

Eight housing units and an association room open to the public
Our team made up of :
•
Architects : Pascaline GASC
• Economist : Fabrice BOUGON
• Structures engineering : Make Ingénierie
• Fluids
engineering : SOLAB
• Lanscape : Atelier NDF
is
named winner of the architectural competition for the construction
of a mixed-use building located at 6/8 rue Bardinet, Paris 14th,
for the construction of eight housing units and an associative
premises open to the public.
Client : PariSeine.développement

Construction of the media library
Our team made up of :
•
Architects : STUDIO 1984
• Economist : Fabrice BOUGON
• Structures engineering : TISCO INGENIERIE
• Fluids
engineering : CHOULET
• Lanscape : Troisième paysage
• Acoustic engineering : GAMBA
• Outdoor facilities engineering
: ATEVE INGENIERIE
is named winner of the architectural
competition for the construction of the media library.
Client : City of Sainte-Geneviève

"Judiciary city"of Cayenne, French Guiana
Our team made up of :
•
Architects : Fabienne BULLE architecte et associés
• Builder
and common legal representative : ARFRATEC-Export
• Associate
Architect : AMARANTE
• Structures and Fluids engineering
: EGIS BATIMENTS ANTILLES-GUYANE
• Economist : Fabrice BOUGON
• Operation and maintenance : Idex Energie Antilles Guyane
• Structural work : GETRA
has been selected to the
competition for the design, construction, development and operation-maintenance
of the judicial city of Cayenne, French Guiana (973).
Client : Agence pour l'immobilier de la Justice (APIJ)
The project of the "judiciary city" includes the following
jurisdictions and functionalities:
- Judicial Court of Cayenne,
- Labor Court,
- Commercial Mixed Court,
- Archives
silo ,
- Administrative Court of French Guiana.

Restructuring and extension of the Departmental Archives
Our team made up of :
•
Architect : Bruno GAUDIN
• Associate Architect : AER
• Structures and Fluids engineering : EGIS
• Economist :
Fabrice BOUGON
has been selected to the competition
for the restructuring and extension of the Departmental Archives.
Client : DEPARTMENT OF HAUTE-SAVOIE - DGA BUILDINGS
AND EDUCATION - BUILDINGS DEPARTMENT
The spaces to be
created include storage spaces, open to public and non-public
spaces and technical spaces representing a surface area (excluding
hallway and corridors) of around 2,634 m² and 825 m²
for above-ground parking.
The project also provides for the
installation of fixed furniture integrated into the building.

Construction of a police station
Our team made up of :
•
Architects : Fabienne BULLE architecte et associés
• Structures
and Fluids engineering : BERIM
• Economist : Fabrice BOUGON
• Environmental engineering : EXEO
• Acoustic engineering
: Studio Fa
has been selected to the competition for
the construction of a police station.
Client : SECRÉTARIAT
GÉNÉRAL POUR L’ADMINISTRATION DU MINISTÈRE DE L’INTÉRIEUR NORD

Construction of a 700 middle school
Our team made up of :
•
Architects : Brenac & Gonzalez & Associés
• Economist
: Fabrice BOUGON
• Structures engineering : OTEIS
•
Fluids engineering : OTEIS
• Lanscape : Jean-Michel RAMEAU
• Environmental engineering : Franck Boutté
• Pilot/co-ordination
: Méthodes & Pilotages
has been selected to the
competition for the construction of a 700 middle school.
Client : Val d'Oise Departmental Council

Construction of a 700 middle school and an athletics hall
Our team made up of :
•
Architects : Brenac & Gonzalez & Associés
• Economist
: Fabrice BOUGON
• Structures engineering : Bollinger &
Grohman
• Fluids engineering : DEERNS
• Lanscape : Jean-Michel
RAMEAU
• Kitchen equipment specialist : ALMA Consulting
• Pilot/co-ordination : Méthodes & Pilotages
has been selected to the competition for the construction
of a 700 middle school and an athletics hall.
Client
: Val d'Oise Departmental Council

Construction of the D2 building
Our team made up of :
•
Architects : VIB Architecture
• Structures and Fluids engineering
: EGIS
• Clean room and controlled atmosphere environment
engineering : SIA ‐ Science et Ingénierie de l’Air
• Economist : Fabrice BOUGON
• Acoustic engineering
: PEUTZ & ASSOCIES
• Fire security : BATISS
is named winner of the competition for the construction
of the D2 building.
Client : National Office for
Aerospace Studies and Research (ONERA)
The D2 building will house 2 departments, each consisting
of units. The following units will be welcomed :
- Optics
and associated techniques
- Optronic components and instruments
- Calibration, realization of optical instruments and measurements
- High angular resolution
- Physical modeling of the
optronic scene
- Laser source and lidar systems
- Physics,
instrumentation, environment, space
- Sensors and micro/nan-
technologies
- Lightning, plasmas and application
-
Instrumentation : aerospace instruments and equipment

Our operation of offices for high-tech in Montpellier nominated for the 2022 "Equerre d'Argent" prize of the magazine "Le Moniteur des travaux publics et du bâtiment" (Moniteur group)

New construction of a building Lot F ZAC CHAPELLE CHARBON PARIS 18th
Our team made up of :
•
Architects : AVENIER CORNEJO
• Economist : Fabrice BOUGON
• Structures engineering : SYLVA CONSEIL
• Fluids engineering
: B52
has been selected to the competition for the new
construction of about 40 housing units and commercial premises
on lot F of the ZAC CHAPELLE CHARBON PARIS 18th.
Client
: Elogie-Siemp

Construction of the building of the future myology foundation
Our team made up of :
•
Architect : REID BREWIN
• Associated architect : TRYPTIQUE
• Structures and fluids engineering : INGEROP
• Laboratories
engineering : BEMING
• Economist : Fabrice BOUGON
•
Environmental engineering : Franck Boutté Consultants
has been selected to the competition for the construction
of the building of the future myology foundation in Paris 13th.
Client : Myology Institut - CAREIT client assistant
This is the grouping on a single site of all the activities
carried out by the Association Institute of Myology by making
available to research teams and support staff, a modern and
efficient tool in the center of Paris. The building is intended
to accommodate the following sectors: "
- L1 and L2 research
laboratories
- Research and evaluation
- Microscopy
- Temporary storage of animals
- Startup
- Myobank
- Morphology
- Computer science
- Coordination-support
- Clinical trials
- Database
- E-learning
-
Consultations / samples
- Nuclear Magnetic Resonance
- Support / Logistics premises.

New construction of a building Lot D ZAC CHAPELLE CHARBON
Our team made up of :
•
Architect : Antoine REGNAULT
• Associated architect : Tanya KLYNE
• Economist : Fabrice BOUGON
• Structures engineering
: EVP
• Fluids engineering : INEX
• Lanscape : Atelier
Jean CHEVALIER
• Sustainable development : LAB Ingéniérie
• Acoustic engineering : Point d'Orgue
has been
selected to the competition for the new construction of a 8
levels building including a minimum of 98 housing units and
business and commercial premises at the ground floor.
Client : PARIS HABITAT

Real estate complex on the lot 11 of the ZAC Python-Duvernois in Paris 20th
Our team made up of :
• Architects
: MUOTO
• Structures engineering : Bollinger-Grohmann
• Fluids engineering : Espace Temps
• Lanscape : SEMPERVIRENS
• BIM Manager : BIM BAM BOUM
has been selected to
the competition for the partial demolition and for the rehabilitation
and new construction of a real estate complex on the lot 11
of the ZAC Python-Duvernois in Paris 20th
Client : RIVP
The operation concerns the partial demolition of a building
(bar A), the heavy rehabilitation of the remaining southern
part of this bar, the construction of fifteen dwellings, the
construction of an activity building, and a multi-day care facility
for early childhood with 48 places.

Youth and sports equipment and student residence 4 rue Mercœur PARIS 11th
Our team made up of :
• Architects
: Abinal & Ropars
• Associated architects : Atelier
Desmichelle Corentin
• Landscape : Mélanie Drevet
•
Economist : Fabrice BOUGON
• Structures engineering : C&E
• Fluids, Environmental and Reus engineering : ALBERT &
CO
• Electricity engineering : ACFI
• Acoustic
engineering : ACV
• Health risks (asbestos / lead) : ANTEA
has been selected to the competition for the demolition
of the Mercœur Centre Paris Anim' (CPA) and construction of
a real estate complex
Client : Elogie-Siemp
The equipment will include the following programmatic entities:
- a student residence of about 40 to 45 housing units
- a youth and sports facility welcoming activity rooms (multimedia,
plastic arts, library, pottery workshop, multipurpose rooms,
theater...) and spaced spaces dedicated to sport (dance hall,
dojo, circus ...) as well as the necessary premises for the
administration of the equipment (offices, relaxation...).

Major restructuring of the Residence Autonomie Beaunier PARIS 14th
Our team made up of :
•
Architects : Studio 1984
• Economist : Fabrice BOUGON
• Structures engineering : TISCO Ingénierie
• Fluids
engineering : EMENDA
• Lanscape : FORR
• Kitchen equipment
specialist : STUDIS
has been selected to the competition
for the major restructuring of the Residence Autonomie Beaunier
PARIS 14th.
Client : Social Action Center of the City
of Paris
The equipment will include the following programmatic
entities :
- a reception
- a restaurant
- common
living spaces and activities
- support premises
- 53
housing units
- administration
- a staff accommodation.

Reconstruction of the Kennedy school group in LYON 8th
Our team made up of :
•
Architect : Bruno MADER
• Economist : Fabrice BOUGON
• Structures and Fluids engineering : TERREL
• Lanscape
: Nebbia Paysage
• Sustainable development : TRIBU
•
Acoustic engineering : GAMBA
has been selected to the
competition for the reconstruction of the Kennedy school group
in LYON 8th.
Client : Lyon city
The school group
will include :
- 8 nursery classes,
- 10 elementary
classes,
- a school restaurant,
- common activity rooms,
- administrative premises,
- a medico-social center
and caretaker's housing.

Construction of buildings for the externalised reserves of the Maritime Museum
Our team made up of :
•
Architect : Hugues FONTENAS
• Heritage curator : Frédérique
VINCENT
• Economist : Fabrice BOUGON
• Structures engineering
: CE
• Fluids engineering : ESPACE TEMPS
• Outdoor facilities
engineering : INFRA SERVICES
is named winner of the architectural
competition for the construction of buildings for the externalised
reserves of the Maritime Museum of Saint-Malo.
Client
: Saint-Malo city
The equipment will bring together
on the site of the ZAC des Fougerais îlot n ° 4 under development
in the south of the municipality different functional entities
such as:
- access area,
- reception areas,
- storage,
- quarantine space,
- workshops,
- logistics and conservation
spaces.

Médicis Ateliers
Our team made up of :
• Architect
: MUOTO
• Associate Architect : TITAN
• Economist : Fabrice
BOUGON
• Structures engineering : Bollinger + Grohmann
•engineering : Espace temps
• Sustainable development : Lab-Ingénierie
• Scenographer : Ducks Scéno
• Acoustic : Acoustibel
•
Lighting : Les Eclaireurs
• Landscaper : Sempervirens
has been selected to the competition for the construction
of a building to accommodate the heart of the Médicis Ateliers
project.
Client : ATELIERS MEDICIS EPCC
The
Médicis Ateliers, already installed since June 2018 on a transitional
site of nearly 1,000 m² in Montfermeil, must integrate in 2025
a hybrid equipment of 6,000 m² in the immediate proximity of
the future station "Clichy-Montfermeil" of line 16 of the Grand
Paris Express. The new Building of the Médicis Ateliers will
be located in the heart of a neighbourhood that is undergoing
considerable change. The new building will include broadcast
spaces including a modular stage with retractable bleachers,
a projection room / auditorium, an exhibition room, workshops
of manufacture, media, publishing, textile, artists and a stage
studio.

Reconstruction of the current fire station
Our team made up of :
•
Architect : Fabienne BULLE
• Economist : Fabrice BOUGON
• Structures and fluids engineering : BETEM
• Sustainable
development : EODD
• Kitchen equipment specialist : ARWITEK
• Asbestos specialist : ANTEA
• BIM Manager : DéfiBIM
is named winner of the architectural competition for the
reconstruction of the current fire station.
Client :
PRÉFECTURE DE POLICE DE PARIS
Its reconstruction aims
to optimize the operational capacity of the fire station and
the number of family housing for the benefit of the firefighters
(SP) assigned to the brigade and, more particularly, within
the firemen unit.

20th Eiffel Tower painting campaign
Our team made up of :
• Architect : Pierre-Antoine Gatier, Chief Architect
of Historic Monuments
• Architect followed-up : CALQ
• Economist : Fabrice BOUGON
• Pilot/co-ordination
: IPCS
• Painting expert : ASCE, Régis Tampere
ensures the project management for the XX painting campaign
of the Eiffel Tower.
Client : Société d'Exploitation
de la Tour Eiffel (SETE)
As every seven years
on average, the Eiffel Tower is repainted. For this 20th
painting campaign, which will last almost three years, it
will also offer itself the first large-scale stripping in
its history.
It's a question of aesthetics, of course,
but not only. The Tower must also protect itself from corrosion.
Every seven years or so since its construction, its approximately
250,000 m² of surface area is covered with a new coat of
paint. For the first time a prior large-scale stripping.

New police station in Epinay-sur-Seine (93)
Our team made up of :
• Architect : Fabienne BULLE
• Economist : Fabrice
BOUGON
• Structures and fluids engineering : BETEM
• Sustainable development : Transition ingénierie
• Security : CRONOS
• BIM Manager : DéfiBIM
has been selected to the competition for the construction
of the new police station in Epinay-sur-Seine (93).
Client : PRÉFECTURE DE POLICE DE PARIS
The project
concerns the construction of a new building allowing the
regrouping of the police station and the Company for
Intervention and Security in a building with a floor
area of approximately 4,625 m².

The Manekine – Regional Intermediate Stage
Our team made up of :
• Architect : Studio 1984
• Economist : Fabrice
BOUGON
• Structures engineering : TISCO Ingénierie
• Fluid engineering : CHOULET
• Acoustic : GAMBA
• Scenographer : Architecture et techniques
has been selected to the competition for the restructuring
and extension of the Manekine – Regional Intermediate Stage
Client : ADTO - SAO
The restructuring project
of La Manekine should enable to offer flexible practice
spaces for work, artist residencies, amateur practice workshops
open to the public and the reception of spectacles thanks
to two rooms to accommodate 360 seats in one and 400 standing
people in the other.

Completion of work of the Halle French Tech
Started in 2019 the construction work of the French Tech hall is being completed.

Completion of work on the Vincent Auriol Boulevard project
The construction works of the construction of family housing and commercial premises boulevard Vincent Auriol are being completed.

Aulnay Sous-Bois (93) SIC
Our team made up of :
• Architect : Fabienne BULLE
• Economist
: Fabrice BOUGON
• Structures and fluids engineering
: BETEM
• Sustainable development : Transition ingénierie
• Security : CRONOS
• BIM Manager : DéfiBIM
has been selected to the competition for the
construction of a building bringing together the Commissariat
and the Company for Intervention and Security.
Client : PRÉFECTURE DE POLICE DE PARIS
The
project concerns the construction of a new building
allowing the regrouping of the police station and the
Company for Intervention and Security in a
building with a floor area of approximately 4,625 m².

Redevelopment of the Sylvanès Abbey
Our team made up of
:
• Architect : Bach Nguyen architecture
• Chief Architect of Historic Monuments : Anne
BOSSOUTROT
• Economist : Fabrice BOUGON
• Structures engineering : Nicolas ROUMAZEILLE
• Fluids engineering : Philippe VIVIER
•
Scenographer : Sophie LIGER
• Acoustic : Federico
CRUZ-BARNEY
• Lanscape : IDTEC Projets de Ville
has been selected to the competition for the
redevelopment of the Sylvanès Abbey
Client
: Community of the Conurbation of Monts, Rance
and Rougier
The Cistercian abbey dating
from 1151 and classified as a Historic Monument
in 1854 is today a high place of Culture, Art and
Spirituality offering training actions in the field
of vocal art, numerous cultural meetings, mediation
and awareness actions for young audiences and an
international festival of Sacred Music – World Music.
Labeled Cultural Center of Encounter in 2015,
music and the dialogue of cultures are at the heart
of its project which brings to the foundations of
its device, the stakes of training, transmission,
development and well-being of the person throughout
life.
The first axis of the development project
aims to build and develop a visitor reception, at
the height of the quality of the monument and the
site which must respect a contemporary architectural
expression of quality, integrated into the historic
monument.

Completion of work on the New Hospital
Inaugurated on Monday, August 30, 2021, the new 229-bed Voiron hospital will consolidate the public care offer in the Voironnais region.

Restructuring and extension of J Area Fontvieille site
Team :
• Architects
: Alexis BLANCHI
MASSIMILIANO FUKSAS ARCHITECTURE
L35 ARCHITECTES
• Landscape : JEAN MUS &
COMPAGNIE
• Economist : Fabrice BOUGON
•
Environmental engineering : OASIIS
• Structures
engineering : BERTULI
• Fluids engineering :
SOMIBAT
• Electricity engineering : INGETEC
• Acoustic engineering : INGETEC
• Fountain building
engineering : JML CONSULTANTS
• Traffic studies
: ACC-S
• Production engineering : LOGIK
•
Project planning, scheduling : EDIFICO
• Technical Supervisor
: SOCOTEC Monaco
• BIM Manager : A.E.C Informatique
Extension and restructuring in an occupied environment.
Client : Principality of Monaco - Domain
administration - SOCRI MC
The equipment will
include the following programmatic entities :
- Shopping center of approximately 37 000
m²
- Restructuring of the existing car park /
logistics level including extension of the Car Park
and logistics level under Avenue Albert II
-
Restaurants 4 355m²
- Cinema
- Stamp Museum
- Offices 1 800m²
- Tower of 41 dwellings
- Park and terraces.

Pasteur school group
Our team made up of
:
• Architect : Bruno MADER
• Economist
: Fabrice BOUGON
• Structures, Fluid and Outdoor
facilities engineering : TERREL
• Ergonomic
and pedagogical classroom furnishings engineering
: ACTION ERGO
• Acoustic : GAMBA
has
been selected to the competition for the construction
of Pasteur school group
Client : Tinqueux
city
The new school group will accommodate
:
- 351 students including 135 in kindergarten
and 216 in elementary school
- 13 teachers
- 1 principal
- 4 ATSeM (Specialised helpers
in pre-school).

Le Corbusier Regional Mixed middle and high schools complex
Our team made up of
:
• Architects : CALORI AZIMI BOTINEAU -
CAB
• Associate Architect : FFBA - François Brugel
• Economist : Fabrice BOUGON
• Structures
engineering : BATISERF
• Fluid engineering :
CHOULET
• Outdoor facilities engineering : OTCI
• Landscape : BASSINET TURQUIN Paysage
•
Acoustic : LASA
• Kitchen equipment specialist
: ALMA Consulting
• Pilot/co-ordination : GLOBAL
• Asbestos removal engineering : LMPR
has been selected to the competition for the
partial restructuring and extension of the Le Corbusier
Regional Mixed middle and high schools complex.
Client : Conseil Régional d'Île-de-France
Pôle Lycées – Direction des Opérations / ILE-DE-FRANCE
CONSTRUCTION DURABLE
The Regional Mixed
schools complex built in 1963 by the architect J.Chauliat
occupies a plot of 6ha on the old park of the Villa
Savoye.
The project concerns the partial
renovation of the block (A building), the heavy
restructuring of the building housing half board
(B building), the demolition of the gatekeeper's
lodge (D building), and the construction of a new
building / extension.

Our team made up of
:
• Architect : Brenac & Gonzalez &
Associés
• Associate Architect : SYNA 4
•
Economist : Fabrice BOUGON
• Structures engineering
: MOZ
• Fluid engineering : ACV
• Outdoor
facilities engineering :AGS
• Landscape : CONPAS
• Acoustic : ACV
• Pilot/co-ordination :
CONPAS
has been selected to the competition
for the extension and rehabilitation of the Montolieu
nursery school with a view to the creation of a
school group.
Client : City of Marseille
The main objectives of the construction
of a new school group on the site of Montolieu street
/ Bon Pasteur street are to meet the shortage of
school facilities in the Saint Charles sector and
to ensure the reception of all children of school
age, in conditions of optimal comfort and safety.
The future establishment will consist of
10 elementary classes and 7 nursery classes, shared
educational spaces (workshops, library, multipurpose
room), ancillary premises (teachers rooms, herbal
teas, dormitories, maintenance rooms, sanitary facilities
...), kitchen, dining rooms, a sports or development
platform, playgrounds and official housing.
The total useful area of this school group will
be about 2600 m² and the outdoor spaces about 2600
m².
The building will also have to meet environmental
requirements and will be designed in a positive
energy building approach.

Large Urban Re-Qualification Project in downtown Ollioules
Our team made up of
:
• Architect : Bruno MADER
• Associate
Architect : 1984
• Economist : Fabrice BOUGON
• Structures engineering : VERDI
• Fluid
engineering : SOLAIR
• Acoustic : GAMBA
•
Landscaper : BASSINET TURQUIN
• Geotech : BEGT
• Scenographer : Architecture et techniques
•
Engineer specializing in public safety : CSD - Faces
• Traffic : ECOMOBILITES TERRITOIRES ET CONNEXIONS
(ETC) SAS
has been selected to the competition
for urban re-qualification in downtown Ollioules
including :
- the construction of a cultural
space and associated facilities
- the construction
of an underground car park
- the construction
of a tertiary building
- the re-qualification
of public spaces and roads within the scope of the
project.
Client : Var Aménagement Développement
on behalf of Ollioules city
The project involves
the construction of 4,962 m² of useful space programmed
for all the project equipment including :
- A cultural space with a common space of 260
m², a 1,008 m² cinema, a 740 m² media library, a
450 m² music conservatory, a 715 m² multipurpose
room/auditorium, a 250 m² brewery, a 120-square-metre
House of Maternal Assistants (HMA), a 120 m² communal
space, a 120 m² communal space
- Two public housing
units or 159 m²
- A 1 400 m² tertiary building
- The construction of 785 underground parking spaces
- The landscaped development of the entire perimeter
of the site (approximately 12,000 m²), including
the transformation of Lemoyne Square into a landscaped
park, the re-qualification of the square of Europe
and the treatment of the street of General Leclerc
de Hautecloque (crossing in a double direction of
traffic, transformation into a priority pedestrians
meeting area, roundabout).

Construction of a school group
Our team made up of
:
• Architects : CALORI AZIMI BOTINEAU -
CAB
• Economist : Fabrice BOUGON
• Structures
engineering : BATISERF
• Fluid engineering :
INEX
• Outdoor facilities engineering :
OTCI
• Acoustic : LASA
• Landscaper : BASSINET
TURQUIN
• Kitchen equipment specialist : ALMA
Consulting
• Geotech : BOTTE SONDAGE
has been selected to the competition for the
construction of the ZAC Rouget de Lisle school group
Client : Poissy city
The new school
group will include:
- 16 nursery school
classes,
- The reception of leisure without
accommodation in classrooms.
The school
group is planned for 2,990 m² of useful surface
and will be the subject of a strong environmental
approach with the aim of achieving a bioclimatic
design level 1 passivhaus label with renewable energy
production.

Facility for re-insertion support
Our team made up of
:
• Builder and common legal representative
: ARFRATEC-Export
• Architect : Fabienne BULLE
• Associate Architect : Acra-Studio
• Economist
: Fabrice BOUGON
• Structures engineering :
EDEIS
• Fluid engineering : OPTIMA
• Fluid
engineering (construction): FROID EXPRESS
has been selected to the competition for the
construction of the DUCOS facility for re-insertion
support
Client : Public Agency for Real
Estate of Justice
The project involves the
design, construction and development of the 120
places facility for re-insertion support before
exit including 90 places in support for exit, and
social reintegration and 30 in the semi-freedom
district in Ducos (972).

Les Fabriques school group
Our team made up of
:
• Architect : Brenac & Gonzalez &
Associés
• Economist : Fabrice BOUGON - Economiste
de la construction
• Structures engineering and
design : Bollinger-Grohmann
• Fluid engineering
and design : ALTO
• Acoustic : ACV
• Outdoor
facilities : AGS
• Landscape : MOZ
• Depollution
engineering : ENVISOL
is named winner of
the architectural competition for the construction
of Les Fabriques school group as part of the development
of the future Les Fabriques eco-neighbourhood at
the seven hectares Littorale ZAC (joint development
zone).
Client : Etablissement Public d’Aménagement
Euromediterranée - EPAEM (public development agency)

Construction of a new laboratory building on the ANSES existing right-of-way in Lyon Gerland
Our team made up of
:
• Architect: VIB
- Associate Architect
: C2BX
• Structures, fluid engineering : ARTELIA
• Economist : Fabrice BOUGON
• Landscaper :
BIGBANG
• Laboratories engineering and design
: LAB CONSULT
a has been selected to the
competition of a new laboratory building on the
ANSES existing right-of-way in LYON.
Client
: French Agency for Food, Environmental and Occupational
Health and Safety (ANSES)
The project concerns
the construction of a building on an unique site,
the Lyon laboratory of the National Security Agency
for Food, Environmental and Occupational Health
and Safety (ANSES) and the Lyon and Paris laboratories
of the National Drug and Health Product Safety Agency
(ANSM).
The proposed building will be built on
the parcel already occupied by several ANSES laboratory's
activities buildings in Lyon.
Projected
surfaces : 8 500 m² SDO
The new building
will include :
- Common spaces
- Office
space assigned to each of the establishments
- Laboratories animal units
- Specific shared
spaces
- A common logistics and technical platform
- Technical premises
- Basement parking.

Reconversion of the Neuilly-sur-Marne site - Health centre of the Ville-Evrard EPS
Our team made up of
:
• Architect and common legal representative
: AIA ARCHITECTES
• Specialized in heritage
conservation architect : 2BDM
• Paysagiste :
BASE
• BET : AIA INGENIERIE
• Economist
: Fabrice BOUGON
• BET Environnement : AIA ENVIRONNEMENT
• Acoustic : GAMBA
is named winner of
the architectural competition for the redevelopment
and extension of the current site with the creation
of a mental health centre.
Client : Etablissement
public de santé mentale de Ville-Evrard
The
project involves the rehabilitation and extension
of the current site for the creation of a Health
Centre includes :
- 6 Adult Full-Time Hospitalization
Units,
- 1 Reception and Intersectoral Crisis
Centre,
- 1 Adult Day care Hospital,
- 1
Partial Time Therapeutic Care Center.

Sports complex – ZAC de l’ARC Sportif
Our team made up of
:
• Builder and common legal representative
: Rabot Dutilleul Construction
• Architect :
Christophe GULIZZI
• Structures and fluid engineering
: BERIM
• Economist : Fabrice BOUGON
• Environmental
specialist : AGI2D
has been selected to
the competition for the construction of a sports
complex.
Client : ASCODEV
The programme
includes a multi-sport hall for the practice of
handball, volleyball, badminton able to host regional
level competitions and the future centre of preparation
for the 2024 Olympic Games. A second multi-sports
hall, a dojo and a multi-purpose hall complete this
equipment.

Major Eastern section of the Ile de France hospital - Redevelopment of the MEAUX Saint-Faron site
Our team made up of
:
• Architect and common legal representative
: Gortemaker Algra Feenstra (G.A.F.)
• Associate
Architect : Emmanuelle Colboc & Associés
• Landscape : CoBe Architecture et Paysage
•
Structures, electricity and outdoor facilities engineering
: Igrec Ingénierie
• Fluid engineering and BIM
management : OTE Ingénierie
• Economist : Fabrice
BOUGON
• Environmental specialist : SA SCOP
ETAMINE
• Pilot/co-ordination : SAS DELTEXPLAN
• Hydraulic specialist : ATM - Agence Thierry
Maytraud
• Acoustic : LASA
• Hospital design
and logistics consultant : APSIS Santé
has
been selected to the competition for la reconfiguration
du site de MEAUX Saint-Faron.
Client : Grand
Hôpital de l’Est Francilien
The project of
a capacity of 461 beds and places and an area of
45,741.00 m² SDO consists of:
1 - The
construction of a new main building with a strong
medical and hospital vocation.
This new
building is expected to :
- Bringing together
medico-technical services (emergency, imaging, interventional
and critical care) in new and functional spaces.
- Install a roofing helipad.
- Install adult
medical, surgery and psychiatry hospitalizations
in adapted and comfortable services with easy access
to the different specialized technical platforms.
- Propose a new main entrance to the medicine-surgery-obstetric
built-up complex, readable, convivial and user-friendly.
- Ideally bringing together the arrivals and
departures of logistics flows around a logistics
court common to the built complex medicine-surgery-obstetric.
- Ensure an efficient connection to Building
B but also to Building C via a covered overpass
connecting the obstetric block to the new intervention
area.
2 – The development of a new 900 vehicles
surface parking lot.
3 – The heavy restructuring
of the current Building B to install residential
and long-term care sleep rooms (conventional hospital
units or critical care units).

Extension of les Pierres Vives high school in Carrières sur Seine (78)
Our team made up of
:
• Architect : RICHARD et SCHOELLER
• Structures engineering : Alpes Structure
•
Fluid engineering : PHOSPHORIS
• Economist :
Fabrice BOUGON
• Outdoor facilities engineering
: AGS DEVELOPPEMENT
• Acoustic : GAMBA
•
Kitchen equipment specialist : GRANDES CUISINES
• Environmental specialist : : TRANS-FAIRE
•
Landscape : MA PAYSAGE
has been selected
to the competition for the Extension of les Pierres
Vives high school in Carrières sur Seine.
Client : ÎLE-DE-FRANCE REGION - High Schools
Department - Major Projects Department

Development of the Paris Miollis administrative site
Our team made up of
:
• Architect and common legal representative
: Brenac & Gonzalez & Associés
• Structures
engineering : Tractebel Engineering SA
• Fluid
engineering : DEERNS France
• Economist : Fabrice
BOUGON
• Outdoor facilities engineering : AGS
DEVELOPPEMENT
• Acoustic : GAMBA
• Fire
security system : Dfenco
• Kitchen equipment
specialist : RESTAURATION CONSEIL
has been
selected to the competition for the development
of the Paris administrative site 21, rue Miollis
in Paris in the 15th arrondissement.
Client
: Direction régionale et interdépartementale de
l'équipement et de l’aménagement d’Île-de-France
(DRIEA IF)
The operation involves the rehabilitation
of the current buildings A, B, D, the development
in Building C and extensions with an overall floor
area of 20,170 m² for :
- The creation
of an administrative campus on the Miollis site
with intensification and an increase in reception
capacity, which will include the future regional
management resulting from the merger of DRIEA-DRIEE,
- A complete rehabilitation of the site and
buildings in view of their dilapidated conditions,
- A dual certification HQE® (High Environmental
Quality Label) and BDF (Sustainable Building Label)
is also targeted in order to make it an exemplary
site from an environmental point of view and to
meet the public policy obligations related to the
energy transition carried by the MTES.

New hospital of the “GHNE” (North Essonne Hospital Group) located on the Saclay plateau combining the medical, surgical and obstetric activities of the 3 sites
Our team made up of
:
• Builder and common legal representative
: Bouygues Bâtiment IDF - Ouvrages Publics
•
Architect : Groupe 6
• Structures, electricity,
fluid and outdoor facilities engineering : Ingerop
• Environmental specialist : Alto Ingenierie
• Economists : AE75 et Fabrice BOUGON
• Acoustic
and vibration : Lamoureux Acoustics
• Light
engineering : Agence Lumière BET
• Electricity
and fluid : Vinci Energies
• Maintenance of
the building : Engie Cofely
has been selected
to the competition for the global sectoral public
contract for the design, construction, development
and maintenance of the new GHNE hospital located
on the Saclay Plateau, which combines the medical,
surgical and obstetric activities of the 3 actual
sites.
Client : Groupe Hospitalier Nord
Essonne
The total capacity of the future
facility is 416 beds and places.
The programme
includes the construction and development of :
- 1 Ambulatory Centre comprising approximately
55 consultation rooms, 30 Day Care places, 1 Health
Centre;
- 1 Medico-technical centre comprising
an Imaging sector, an intervention area (11 operating
rooms, 7 birth rooms), an Ambulatory Surgery Unit
(23 beds), critical care (36 beds, 12 incubators),
an emergency sector; - 1 280-bed accommodation centre
for Medicine, Surgery, Obstetrics (and 6 Kangaroo
Baby Beds) and Pediatrics;
- Medico-technical
and so called "hotel” logistics functions.

Construction of 100 housing and 50 parking spaces - Zac des Tartres - Lot 75S
Our team made up of
:
• Architect and common legal representative
: Brenac & Gonzalez & Associés
• Structures,
electricity, fluid and outdoor facilities engineering
: COTEC Ingénierie
• Economist : Fabrice BOUGON
• Environmental specialist : OASIIS
• Acoustic
: GAMBA
• BIM management : BIM BAM BOOM
has been selected to the competition for the
construction of 100 housing and 50 parking spaces
- Zac des Tartres - Lot 75S.
Client : LOGIREP

Digital home
Our team made up of
:
• Architect : Francis SOLER
• Structures
engineering and design : C&E Ingénierie
•
Fluid engineering and design : Alterea
• Acoustic
: EMACOUSTIC
• Economist : Fabrice BOUGON
• Fire security System : Bleuse
• BIM : It's
• Landscape : Damée Vallet Associés
is named winner of the architectural competition
for the construction of the Digital Home on the
site of the Institute University of Technology in
Sarcelles.
Client : Roissy Pays de France
Conurbation Community
The Roissy Pays de
France Conurbation Community wants to promote and
support the emergence of the digital sector on its
territory by building a Digital Home in the commune
of Sarcelles. The Digital Home will be a place of
open innovation, discovery, learning, creation,
experimentation and development of economic and
social activities that enhance the specificities
of the territory. This tertiary building will host
:
- Business services (coworking space, offices,
meeting rooms, training);
- Cross-cutting services
(reception, administration, exchanges).

Refitting of a real unit located 12 Porte de Vanves avenue in Paris 14th
Our team made up of
:
• Architect : ABINAL & ROPARS
• Economist : Fabrice BOUGON
• Structures engineering
: EVP
• Fluid engineering : Elements ingéniérie
• re-use and recycling engineering and specialist
: R-USE
• Landscape : Flore DOHY
has
been selected to the competition for the refitting
of a real unit located 12 avenue de la Porte de
Vanves in Paris 14th
Client : RIVP
The program includes the construction of approximately
5 400 m ² of residences with a carpark in infrastructure,
the creation of approximately 5 000 m ² of buildings
of activities and work outside the buildings of
external spaces

Works completion
Organized by the Pavillon de l'Arsenal, visits of end of work of the 222, Charenton street residences program
In presentation on :
Link to the Pavillon de l'Arsenal website
or
In pictures

Construction of the new Voltaire college and his gymnasium
Our team made up of
:
• Architect : BRUTHER
• Structures
engineering : BATISERF
• Fluid engineering and
design : CHOULLET
• Economist : Fabrice BOUGON
• Kitchen equipment specialist : ARWYTEC
• Acoustic
: GAMBA
• Pilot/co-ordination : AIA Management
de projet
has been selected to the competition
for the construction of the new Voltaire college
and his gymnasium.
Client : Hauts-de-Seine
department
The operation program envisages
the construction, on a piece of 7 300 m ² of the
site called “Asnières-University ”, of a college
of a capacity of 700 pupils, is gymnasium with accessible
dojo to communal associations and of five Personnel
accommodation. The unit represents a surface of
approximately 8 300 m ² SDP

“Building site” open to the public project accompanying the Saint-Denis basilica tower and the spire reassembly building site
The basilica of Saint-Denis,
cradle of the Gothic art, was built in XIIe under
the aegis of the Suger abbot. Its northern tower
and its spire which culminates with 90 meters of
the ground, were maintained and restored until the
XIXème century.
After being damaged by the
lightning strike in 1846, the arrow is dismounted
under the direction of Viollet-le-Duc and the cathedral
is left not reassembled its spire since more than
one century and half.
A building site of
reassembly of the tower and spire, are considered
under the direction of the ACMH Jacques Moulin and
with the Unit of archaeology of Saint-Denis on the
basis of the many graphic documents produced at
the time of their disassembling in 1846 and 1847.
“Suivez la flèche” association plans to
finance the rebuilding of this heritage, vector
of urban revival, by opening it on the territory
to allow the public to discover the work of the
Masters builders and the techniques of medieval
construction.
A feasibility study of the infrastructures
making it possible the public to visit this building
site of rebuilding was carried out by Frederic Kieff
- Architect and Maryline Gillois - Scenographer.
Our mission constituted in the cost evaluation
of these transitory infrastructures of the duration
of the building site envisaged on ten years, consisted
of a reception of the public, a tower allowing view-point,
a village building site gathering all the specialities
of craftsmen of medieval techniques and all the
associated scenography / museography equipments.
Newspaper “Libération” article of May 2, 2019

Equestrian center
Our team made up of
:
• Architect : B+C
• Economist : Fabrice
BOUGON
• Structures and fluid engineering :
BETOM
• Sporting equipment specialist : OSMOSE
• Acoustic engineering and design : : VENATHEC
has been selected to the competition for
the extension and rehabilitation of the equestrian
center
Client : Gennevilliers city

School complex and crib in the Jean Zay district
Our team made up of
:
• Architect : Brenac & Gonzalez &
Associés
• Structures engineering : BATISERF
• Fluid engineering and design : ALTO Ingéniérie
• Economist : Fabrice BOUGON
• Façades specialist
: BOLLINGER GROHMANN
• Pilot/co-ordination :
Méthode et pilotage
• Acoustic : ACV
has been selected to the competition for the
construction of a school complex and crib in the
Jean Zay district.
Client : Antony city

Marine biomimetism excellence pole
Our team made up of
:
• Architect : BRUTHER
• Architect
: GARDERA-D
• Structures engineering : BATISERF
• Fluid engineering and design : CHOULET
• Economist
: Fabrice BOUGON
• Environmental specialist :
ATMOSLAB
has been selected to the competition
for the realization of a marine biomimetism excellence
pole.
Client : Basque country urban community
conurbation (in Basque : Euskal Hirigune Elkargoa)

Pion District new school group
Our team made up of
:
• Architect : MUOTO
• Economist :
Fabrice BOUGON
• Structures engineering : TRACTEBEL
• Fluid engineering and design : INEX
• Acoustic
: Acoustibel
has been selected to the competition
for the for the realization of a new school complex
of 6 classes within the framework of the installation
of the new “Pion” district for the Versailles city.
Client : ICADE PROMOTION

Market halls
Studies for the rehabilitation
of the market halls, Vincent Raspail place at Toulon
La Garde
Architectural and Engineering Team
:
• Architects : CIMAISE
• Structures
engineering : BOST Ingéniérie
• Fluid engineering
and design : SERTED
• Economist : Fabrice BOUGON
Client : BIltoki

Marceau school group
Our team made up of
:
• Architect : HESSAMFAR & VERONS
• Architect : BAJOLLE & GIANNI
• Economist
: Fabrice BOUGON
• Structures engineering and
design : URECESMA
• Fluid engineering and design
: INEX
• Acoustic : EMACOUSTIC
• Outdoor facilities
: VIA INFRASTRUCTURE
• Landscape : TERRITOIRES
LANDSCAPE
is named winner of the architectural
competition for the construction of the future Marceau
school group as part of the re-conversion of the
" Belle de Mai " military barracks site.
Client : City of Marseille

Realization of residences for young workers
Our team made up of
:
• Architect : MUOTO
• Economist :
Fabrice BOUGON
• Structures engineering : EVP
• Fluid engineering and design : Espace Temps
• Acoustic : Acoustibel
is named winner of
the architectural competition for the realization
of residences for young workers - Vaugirard RATP
workshop 222-224, The Croix Nivert street - PARIS
15th.
Client : RATP – Département Valorisation
immobilière, Achats & Logistique

« Foundation stone » building of the Paris Est - Marne la Vallée University at the Val d’Europe
Our team made up of
:
• Architects : HESSAMFAR & VERONS
• Economist : Fabrice BOUGON
• Structures
engineering : KEPHREN
• Fluid engineering and
design: CHOULET
• Acoustic : EMACOUSTIC
•
Design of external works : 2idf
a has been
selected to the competition for the construction
of the « Foundation stone » Paris Est Marne - la
Vallée University building at the Val d’Europe -
Serris (77).
Client : Ile-de-France region

Reconstruction of the Tixier Mougne nursery school
Our team made up of
:
• Architects : RICHARD and SCHOELLER
• Structures engineering : Alpes Structure
• Fluid engineering and design : GARNIER
• Economist
: Fabrice BOUGON
has been selected to the
competition for the reconstruction of the Tixier
Mougne nursery school
Client : City of Reims

The hospital of the future is preparing its landing with care

Construction of an exit preparation district
Our team made up of
:
• Architect : Fabienne BULLE
• Builder
: CMEG
• Economist : Fabrice BOUGON
• Electricity
engineering and design : RESO
• Fluid engineering
and design : BABIN
• Acoustic : ORFEA
• Security
: GEOLYS
has been selected to the competition
for the construction of an exit preparation district.
Client : APIJ

Students housing and laboratories Davout boulevard
Our team made up of
:
• Architect : MUOTO
• Architect :
BLOCK
• Structures engineering and design : EVP
• Fluid engineering and design : Espace Temps
• Economist : Fabrice BOUGON
• Acoustic : Acoustibel
• Sustainable development : Transsolar
is
named winner of the architectural competition for
the rehabilitation, expansion and transformation
of a building to create a hundred student housing
and 5500 m² of offices and laboratories – 133 Bd
Davout Paris 20th.
Client : RIVP

Progress of the construction in time-lapse photography
Accelerated effect video of the construction :
here

Reconstruction of a cultural space and construction of students housing - Dareau street
Our team made up of
:
• Architects : AVENIER - CORNEJO
• Economist
: Fabrice BOUGON
• Engineering and design Structures
: EVP
• Fluid engineering and design : B52
• BET HQE : ETAMINE
• Acoustic : ACOUSTIBEL
is named winner of the architectural competition
for the reconstruction of a cultural space and construction
of students housing.
The program includes
the demolition of an existing building and the new
construction of a housing complex of 51 students
housing and a cultural space dedicated to musical
amateur and professional practice - 20 Dareau street
in Paris 14th, property of "La Sirène - Orchestre
d'harmonie de Paris" Association.
Client
: RIVP

Galeries Lafayette department store
Studies for the rebuilding
of the Galeries Lafayette department store
Architectural and Engineering Team :
• Architects : BRUTHER
• Structures engineering
: BATISERF
• Fluid engineering and design :
INEX
• Economist : Fabrice BOUGON
• Fire
safety engineering and design : CSD
• Acoustic
: GAMBA
• Environmental specialist : ATMOSLAB
• Fire safety consultant : Laboratoire D'ingénierie
De La Sécurité Incendie
Client : GRANDS
MAGASINS GALERIES LAFAYETTE - CITYNOVE

Master plan for the accessibility of the stations of the Francilien Network
Our team made up of
:
• Performance and mobility connected, personalized
and sustainable development expert : KISIO Consulting
• Economist : Fabrice BOUGON
is appointed
to ensure an assistance mission in the control of
the realization of the objectives of the master
plan for the accessibility of the stations of the
Francilien Network - Comprehensive analysis of the
costs of the network of train stations SNCF
The mission is to provide assistance to the
decision and the knowledge of reality and the cost
structure of ongoing studies for Paris and suburban-train
stations
Client : SYNDICAT DES TRANSPORTS
D’ILE DE FRANCE

Rehabilitation and restructuring of the îlot Perrée building
Our team made up of
:
• Architect : Bruno GAUDIN
• Builder
: Rabot Dutilleul
• Structures engineering :
SYNA4
• Fluid engineering and design : MTC
• Economist : Fabrice BOUGON
• Acoustic : ACV
• Durable Development and Environment : AB Environnement
• BIM : Foundation
has been selected
to the competition for the rehabilitation and restructuring
of the îlot Perrée building for the installation
of a new Paris 10th police station
Client
: Préfecture de Police de Paris

Award
Handed-over June 18, 2018, at the House of Architecture - Convent of the Recollets in Paris, of the Academy of Architecture 1981 Foundation Award.

Nursery school
Delivery of the new
nursery school
Client : Epernon city
Architectural and engineering team :
• Architects : RICHARD et SCHOELLER
• Economist
: Fabrice BOUGON
• Structure engineering and
design : Alpes Structure
• Fluid engineering
and design : S2T
In picture :
Here

Restoration of east and central parts Foundation of the “Fondation des États-Unis” at "Cité Internationale Universitaire" of Paris
Work in progress
Client : Fondation des États-Unis
Architectural
and engineering team :
• Architect : Atelier
Circonflexe
• Engineering and design Structures
: DELTA Groupe
• Fluid engineering and design
: Espace Temps
• Economist : Fabrice BOUGON
• Acoustic : Alternative

Blue school
Our team made up of
:
• Architect : MUOTO
• Structures engineering
and design : EVP
• Fluid engineering and design
: Espace Temps
• Economist : Fabrice BOUGON
• Acoustic : Acoustibel
• Sustainable development
: Transsolar
has been selected for the competition
for the construction of a building for the blue
school.
Client : RIVP

Construction of housing and a commercial premise 6bis - 8 Passage Ramey, Paris 18th
Our team made up of
:
• Antoine REGNAULT - Architect
• EVP
- Structures engineering and design
• B52 -
Fluid engineering and design
• Fabrice BOUGON
has been selected to the competition for the
construction of 30 housing and a commercial premise
6bis - 8 passage Ramey, Paris 18th.
Client
: RIVP

Logistics Urban Hotel (LUH)
Our team made up of
:
• Architects : VIB
• Economist : Fabrice
BOUGON
• Structures and fluids engineering and
design : NOX
• Fire security : BATISS
has been designated to conduct the studies
and the deposit of a building permit for the conversion
of a former postal sorting center on the site of
Nanterre CLC to an Logistics Urban Hotel .
Client : La Poste Immo

“Aquae Segetae” archeological Gallo-Roman site museum
Our team made up of
:
• Bruno MADER - Architect
• BATISERF
- Engineering and design Structures
• CHOULET
- Fluid engineering and design
• Fabrice BOUGON
- Economist
• ATEVE - External works
• Studio
FORR - Landscaping
• GLOBAL - OPC
has
been selected to the competition for the construction
of a site museum and its various modules (resources,
pedagogy, archaeological) as well as external installation
of the visit course of the archeological Gallo-Roman
site “Aquae Segetae”.
Its vestiges and in
particular the water sanctuary form today an archeological
site located 2.300 m from the east of Sceaux-du-Gâtinais
in the Loiret French department and Centre-Val de
Loire area.

Social housing and a commercial premise - Des Bergers street
Demolition and construction
of 16 social housing and a commercial premise 31,
Des Bergers street - Paris 15th.
Client
: RIVP
Architectural and engineering team
:
• Architect : Antoine REGNAULT
• Engineering
and design structures : EVP Ingénierie
• BET
Fluid engineering and design : B52
• Economist
: Fabrice BOUGON
• Demolition engineering: STM

Construction of family residences and commercial premises - Vincent Auriol boulevard
Starting of work for
the realization of 65 family residences and commercial
premises - 90, Vincent Auriol Boulevard Paris 13th
district.
• ABINAL & ROPARS - Architects
• BOLLINGER GROHMANN - Engineering and design
Structures
• CHOULET - Fluid engineering and
design
• Fabrice BOUGON - Economist
• ACV
- Acoustic
• CASSO - fire safety
Client
: PARIS HABITAT

Burn care unit centre
Inauguration on December
6, 2017 of Burn care unit centre at the Percy Instruction
of armies hospital
PDF Presentation

Building and Health - What role for economists

French Tech Hall
Our team made up of
:
• MUOTO - Architect
• EVP - Engineering
and design Structures
• CHOULET - Fluid engineering
and design
• Fabrice BOUGON - Economist
•
Acoustibel - Acoustic
• NOBATEK - Environnement
engineering
• CASSO - fire safety
• Epsilon
GE - external works and landscaping
• C &
G - Syntheses
• ARTEBA - OPC
is named
winner of the architectural competition for the
construction of the French Tech Hall.
Part
of the development of the Cambacérès neighborhood,
the new building will be built close to the TGV
station from 2018.
"Future showcase" of
the city this major equipment consisting in a digital
halle, emblem of the French Tech, is called to welcome
hundreds of start-ups
Some press articles
:
La Tribune
or
La gazette de Montpellier
or
Montpellier

Inauguration on September 28, 2017 of the Broca Nouvelle Aquitaine center | NEUROCAMPUS in Bordeaux, research center in neurosciences
Following a competition
win at the end of 2011 and after two and half years
of studies and three years of construction work
the project of research laboratories in neurosciences
NEUROCAMPUS, henceforth called the Broca Center
is in exploitation and has been inaugurated on September
28, 2017.
Dynamics, inter alia, of three
principal researchers :
- Pier-Vincenzo
Piazza director of research at the Magendie Neurocentre
of Bordeaux, doctor, psychiatrist and neurobiologist
specialized in the psychiatric and addictology diseases,
- Daniel Choquet, director of the interdisciplinary
institute of neurosciences and of the mixed unit
of research at the CNRS and the University of Bordeaux
- Erwan Bézard, director of the neurodegenerative
diseases Institute of the mixed unit of research
at the CNRS and the University of Bordeaux and also
director of research in Inserm,
allowed to
consider the realization of 13.000 m² joining together
two existing buildings on the Carreire site, the
Magendie Institute and the Functional genomics Platform
around a new central building.
47M€ for
construction and 20M€ building endowment for advanced
equipment and chairs of Excellence were dedicated
to this Broca Center, that welcomes 650 researchers
and scientists and gathers two institutes NDI (Neurodegenerative
Diseases Institute) and IINS (Interdisciplinary
Institute of NeuroSciences), as well as a platform,
“Bordeaux Imaging Center”, benefiting 29 microscopes
with very high resolution.
Objective: “to
observe the infinitely small”: neurons (the human
brain counts on average 80 billion them) or still
smaller, the synapses (approximately 10.000 synapses
per neuron…).
More on our presentation :
here
And some press articles :
Bordeaux Neurocampus
Aqui !
La Tribune - Bordeaux
France 3 Régions
Bordeaux7

New Lens hospital
In video presentation
:
NCHL
or more
Web site presentation of the project by the Lens
hospital center

Inauguration of the theatre 13 / Jardin
After two years of work theatre 13 in Paris also called theatre 13 / Jardin in resonance with another operation we delivered a few years ago (the theatre 13 / Seine - 30, Chevaleret street), both directed by Colette Nucci, was inaugurated tuesday february 21 2017.

Tafanel Site development (warehouses)
Delivery in June 2017
of the restructured warehouses. In video presentation
on :
Le Pavillon de l'Arsenal TV
or
Dailymotion

Building of residences, crib and emergency lodging house
Delivery of a building
of residences, crib and emergency lodging house
Stendhal street PARIS 20ème. In video presentation
on :
Le Pavillon de l'Arsenal TV
or
Dailymotion

Competition for the rebuilding of the Universitary Hospital Complex of Caen
Our team made up of
:
• AGENCE MICHEL BEAUVAIS & ASSOCIES
SAS d’architecture et d’urbanisme - Architect
• CPI and Ateliers 2/3/4 – Architects
•
EDEIS and PROJEX – Multi-trade engineering
•
Tem Partners – Laboratory engineering
• Fabrice
BOUGON – Economist
• OASIIS – Durable Development
and Environment – Green engineering
has
been selected among the four teams of architects
and engineering admitted to the competition for
the rebuilding of the University Hospital Complex
of Caen, cast solid building of the seventies conceived
by the architect Henri Bernard. The surface of the
rebuilding is estimated at approximately 110.000
m² to fit on a land area of approximately 12,5 hectares.
The project aims to rebuilding on the Northern
area of the University Hospital Complex of Caen
the following activities all while grouping them
:
- The totality of the medicine activity
and surgery of the University Hospital Complex except
Mother-Child unit.
- The totality of the medicotechnic
supports services, logistics (sterilization, general
stores, garage, pharmacy, self service catering
) and administrative.
- The totality of the
biology activity currently split over two sites.
- The partial rebuilding of the technical infrastructures
(medical fluids and gases, heating, Refrigeration
- airconditioning systems, data processing, water,
sanitation).
The new University Hospital
unit will add up 1049 MSO beds and places including
207 places in day hospital, 645 full hospitalization/week
hospitalization beds and 197 critical care beds
for a rebuilds capacitaire of 797 beds and places,
22 surgical activity rooms, 9 interventional radiology
rooms and 4 endoscopy rooms.

Lariboisière
Our team made up of
:
• MICHEL REMON & ASSOCIES - Architects
• François CHATILLON – Architects
• NP2F
– Architects
• SETEC – Engineering and design
• Fabrice BOUGON – Economist
• TRIBU – HQE
as been selected to the competition for
the realization of the first phase of the project
of the New Lariboisière Hospital

Fulton – ZAC Paris Rive Gauche – 75013 PARIS Lot n° A5A3
Construction of buildings
of approximately 110 residences, two trade and equipment
of the early childhood.
Client : ICF La Sablière
Architectural and engineering team :
• Architect : Ignacio PREGO
• Engineering
and design Structures : ARCADIS
• Fluid engineering
and design : INEX
• Economist : Fabrice BOUGON
- Economist
• Acoustic engineering : Acoustique
Vivié
• Environnement engineering : Plan 02

Charenton
Construction of 22 residences
and 3 business premises 222, rue de Charenton 75012
Paris
Client : HSF
Architectural
and engineering team :
• Architects : AVENIER
- CORNEJO
• Economist : Fabrice BOUGON - Cost
estimating and budget control
• Engineering and
design Structures : EVP
• Fluid engineering and
design : B52

Social residence
Construction of a social
residence of 150 residences Lot A1a - ZAC Campus
Grand Parc 12, 16, 18 and 20 passage Charles Dehan
and avenue of President Allende in Villejuif (94).
Client : ADOMA
Architectural and
engineering team :
• Architects : AVENIER
- CORNEJO
• Economist : Fabrice BOUGON – Economist
• Engineering and design Structures : EVP
• Fluid
engineering and design : B52
• Environnement
engineering : ETAMINE
• Specialised enginnering
: SAGA

New Lens hospital
Our team made up of
:
• AGENCE MICHEL BEAUVAIS & ASSOCIES
• SAS d’architecture et d’urbanisme - Architect
• SETEC – Multi-trade engineering
• Fabrice BOUGON
– Economist
• OASIIS AGENCE IDF – Durable Development
and Environment – Green engineering
is appointed
prize winner among four teams of the restricted
competition regarding the construction’s project
management of the new hospital of Lens.
The future hospital of about 72,000 m² will include
medicine, surgery, and obstetrics activities and
in particular technical platforms, a mother-child
centre, specialized medicine activities, surgery
and emergency facilities.
The client has
put forth the following major elements which should
define this future « digital hospital »: a hospital
turned toward the new information and communication
technologies, managed thanks to information modelling,
with a strong environmental ambition correlated
with the principles of the Third Industrial Revolution
in Nord-Pas-de-Calais region.

Technical Municipal Centre
Construction of the
municipal garage and building for the urban cleaning
service
Client : City of Malakoff
Architectural and engineering team :
• Architect : Philippe DUBUS
• Economist : Fabrice
BOUGON - Cost estimating and budget control
•
Engineering and design Structures : BERIM

Media library
The media library of
Grenay was inaugurated in June 2015
Client
: City of GRENAY
Architectural and engineering
team :
• Architects : RICHARD + SCHŒLLER
• Economist : Fabrice BOUGON
• Engineering and
design Structures : ALPES STRUCTURES
• Fluid
engineering and design : ESTB
• Acoustic engineering
and design : ABC DECIBEL

Conference RICS may 18, 2015
Intervention during
the new formation of May 18, 2015 at the head office
of the RICS in London within the framework of the
workshop “practical Case: cost estimating in a residential
project : 240 residences, Les Lilas (93) and 60
residences Zac Masséna (75)”.
This formation
had as a transverse subject housing through the
aspects of market, promotion, the sale contracts,
the transaction, real management, the technology
of the building, the evaluation and ethics with
the presentation of the code of ethics of the National
Council of the Transaction and Real Management.
This formation was intended to the members of
the RICS to enable them to bring up to date their
formation while concentrating on topics of current
events like the law Alur and to discover the standards
of the RICS like the REABS and the REM,…

Zac Clichy Batignolles
Lot N1
The Clichy-Batignolles
sector is located at the North-West of Paris, in
the 17th district. It is delimited by the railway
lines Saint-Lazare, the street Cardinet, the avenues
of Clichy and Porte de Clichy, and the ring road
in north.
The project includes:
• 46 intermediate residences
• 32 social housing
• 150 social housing student
• A CHRS (accommodation
and social rehabilitation centre) 40 places
• A Lodging healthcare structure
• businesses
• An additional room for RATP and a hood of 680
m² approximately
Client : RIVP
Architectural
and engineering team :
• Architects : Ignacio
PREGO et Thibaud BABLED
• Scenography engineering
and design : Architecture & Technique
• Economist
: Fabrice BOUGON
• Engineering and design Structures
: ARCADIS
• Fluid engineering and design : Delta
fluides
• Acoustic engineering and design : Acoustique
Vivié
• Environnement engineering and design
: ELEMENTS Ingénierie

Calvi Balagne Cultural Centre
Theatre and cinema
The project of national scene includes :
• a theatre room of 333 places,
• a repetition
room,
• a movie theater of 102 places.
Client : Community of the Conurbation of CALVI
BALAGNE
Architectural and engineering team
:
• Architect : Francis SOLER avec Marion
Gauguet, Céline Antoine, Matthieu Ronzatti and with
Sébastien Van Cappel
• Scenography engineering
and design : Architecture & Technique
•
Economist : Fabrice BOUGON
• Engineering and
design structures/facades : VP&Green
• Fluid
engineering and design : Espace Temps
• Acoustic
engineering and design : Jean-Paul LAMOUREUX

Galleries 1 and 2 - National Center of Art and Culture George Pompidou
Work of reconfiguration
of the galleries 1 and 2 located at level 6 of the
National Center of Art and Culture George Pompidou,
Paris 4th is under development.
Client :
National Center of Art and Culture George Pompidou
Architectural and engineering team :
• Architect : Agence B+C
• Economist : Fabrice
BOUGON - Cost estimating and budget control
•
Engineering and design Structures and fluid : ARETEC

Daviel Center
Reconstruction work
of the Daviel center is under development.
This
facility includes the animation center of Daviel
and Theatre 13.
The Daviel Center belongs to
the small pedestrian island “Daviel”, delimited
by the streets Glacière, Daviel, Vergniaud and the
Blanqui boulevard in Paris 13.
Client :
Paris Heritage and Architecture Services
Architectural and engineering team :
• Architect
: Eric PANNETIER
• Economist : Fabrice BOUGON
- Cost estimating and budget control
• Engineering
and design Structures : INGERCO
• Fluid engineering
and design : RCA
• Acoustic engineering and
design : Acoustique Vivié
• Durable Development
and Environment - Green engineering : Albert &
Compagnie

School group and gymnasium - Macro lot A4 East of the ZAC Seguin Rives de Seine - A mineral cliff for flora and fauna

Reconfiguration of the first floor of the Eiffel Tower - The Eiffel Tower plays with transparency

National Archives - Archives and reserves open to the city

General-purpose school, theatre and 66 housing - ZAC Paris Rive Gauche, Paris 13
In video presentation
on :
Le Pavillon de l'Arsenal TV

ZAC Porte Les Lilas - Realization of housing for migrants and young workers and crib
In video presentation
on :
Le Pavillon de l'Arsenal TV
or
Dailymotion

Autrement Rebière Street 20 Housing, Stéphane Maupin & Partners
In video presentation
on :
Le Pavillon de l'Arsenal TV
or
Dailymotion
A few figures
Since the
creation of our agency we have delivered :
230 000 m²
of facilities public
150 000 m² of housing
the total
cost of the projects that we have studied and evaluated
is established in 7 200 000 000 € excluding Value Added
Taxes (VAT).



